PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed sprinkler pipes at the 2nd floor Facing North.jpg Laying out block at the 3rd floor detention cells Facing North.jpg Laying out block at the 3rd floor Detention cells Facing West.jpg Sprinkler pipe material.jpg 3rd floor Interior metal framing Facing North-West.jpg Constructing parapet along the High Roof Facing South-West.jpg Constructing the parapet along the high roof Facing East.jpg Installed junction boxes at the cmu wall.jpg Installed roof drains at the low roof Facing North-East.jpg
Previous pageNext page 3rd floor Interior metal framing Facing North-West
3rd floor Interior metal framing Facing North-West